Quality Center 11.0 Essentials
This hands-on course provides the tools you need to implement and utilize Quality Center 11. Students learn how to manage quality information throughout the development cycle, from constructing requirements, designing and executing tests, through monitoring defects.
Note: Course is based on the Enterprise edition of Quality Center.
- Cost: €2200.00
- Duration: 4 Days
- Cork Date:
- Limerick Date:
- Dublin Date: 12-15 Jul
- This course is also available as a customised client specific course.
Working knowledge of:
• Windows
• Testing concepts
At the end of the course, you will be able to:
• Create releases and cycles.
• Construct requirements.
• Analyze risks associated with requirements.
• Organize subjects and tests in a test plan tree.
• Design and create test plans.
• Generate test scripts from design steps.
• Create test sets.
• Execute manual and automated tests.
• Use Hp Sprinter on manual tests.
• Record and track test execution results.
• Log and manage defects.
• Use version control to keep track of changes.
• Create and manage libraries.
• Create and compare baselines.
• Import and export from Microsoft Excel
• Generate reports and graphs using the Dashboard.
• Understanding the relationship between releases and cycles
• Creating a release tree
• Assigning requirements to releases and cycles
• Assigning tests to releases and cycles
• Understanding requirement types
• Specifying requirements
• Building a requirements tree
• Assigning requirements to releases and cycles
• Adding traceability links between requirements
• Establishing the business criticality and failure probability of a requirement
• Performing risk analysis for a group of requirements
• Utilize the traceability matrix
• Building a test plan tree
• Creating tests
• Using parameters in tests
• Generating test scripts
• Linking tests and requirements
• Designing test steps
• Generate a live analysis graph
• Create test coverage in the Requirements module
• Create requirement coverage in the Test Plan module
• Create requirement coverage using test configurations
• Analyze cycle progress
• Track cycle progress with the test set folders
• Building a test sets tree
• Creating test sets
• Add tes
• Linking test set folders to releases and cycles
• Managing test execution flow and test dependences
• Executing manual and automated tests
• Recording and reviewing test execution resultsts into test sets
• Open a test and prepare it to run
• Work with power mode
• Work with mirroring
• Run the test
• Submit a defect
• Annotate a screen capture
• Use macros
• Use data injection
• View run results
• Logging defects
• Searching and reviewing defects
• Associating defects to other entities
• Tracking the status of defects
• Checking out
• Checking in
• Viewing version history
• Comparing versions
• Promoting an older version
• Defining a library
• Defining a baseline
• Comparing baselines
• Pinning a test set to a baseline
• Export tests from Excel to Quality Center
• Enter design steps in the Excel spreadsheet and import the test to Quality Center
• Generate analysis reports and graphs using the Dashboard.